INSPECTION
1. Disassembly
2. Assessment of internal parts
PROVIDING AN ESTIMATE
1. Must be approved or declined by customer
2. If the estimate is approved, the work is done at the exact cost of the estimate
ASSEMBLY
1. Replacement of seals and bearings
2. Replacement of any manufacturer specific parts
3. Re-adjusting the preload
4. All tools are test run for noise and temperature
5. The results of the test are shipped with the tool